Running Excavations
 |
 |
|
| Space of time: |
| Size of excavation team: 3 - 6 |
| Size of excavation area: bisher 13000 m² |
Completed Excavations
 |
 |
|
| Space of time: 10.-31.01. und 19.05.-17.06.208 |
| Size of excavation team: 3 - 4 |
| Size of excavation area: 230 m² |
 |
 |
|
| Space of time: 07.04.-09.06.2008 |
| Size of excavation team: 5 - 10 |
| Size of excavation area: 4000 m² |
 |
 |
|
| Space of time: 11.03.-02.04. und 21.-29.04.2008 |
| Size of excavation team: 3 - 4 |
| Size of excavation area: 180 m² |
 |
 |
|
| Space of time: |
| Size of excavation team: 04.10.2006-20.09.2007 und 07.01.-27.02.2007 |
| Size of excavation area: 2700 m² in bis zu 6 Plana, gesamte Untersuchungsfläche 4500 m² |
 |
 |
|
| Space of time: 13.-20.12.2007 |
| Size of excavation team: 2 |
| Size of excavation area: 150 m² |
 |
 |
|
| Space of time: 10.-13.12.2007 |
| Size of excavation team: 2 |
| Size of excavation area: 300 m² |
 |
 |
|
| Space of time: 03.09.-29.11.2007 |
| Size of excavation team: bis zu 20 |
| Size of excavation area: Gesamtbeobachtungsfläche 90000 m² |
 |
 |
|
| Space of time: 23.-28.11.2007 |
| Size of excavation team: 2 |
| Size of excavation area: 150 m² |
 |
 |
|
| Space of time: 5 - 8 |
| Size of excavation team: 13.08.-22.10. und 05.-09.11.2007 |
| Size of excavation area: 300 m² in bis zu 5 Plana, gesamte Untersuchungsfläche 620 m² |
 |
 |
|
| Space of time: 04.-24.10.2007 |
| Size of excavation team: 2 |
| Size of excavation area: 45 m² |
 |
 |
|
| Space of time: 06.08.-04.10.2007 |
| Size of excavation team: 4 |
| Size of excavation area: 380 m² |
 |
 |
|
| Space of time: tageweise zwischen 26.03.-02.06.2007 |
| Size of excavation team: 1 |
| Size of excavation area: 10 m² |
 |
 |
|
| Space of time: 02.08.-01.12.2006 und 16.04.-09.05.2007 |
| Size of excavation team: 4 - 10 |
| Size of excavation area: 18000 m² |
 |
 |
|
| Space of time: 14.03.-05.04.2007 |
| Size of excavation team: 3 - 4 |
| Size of excavation area: 90 m² |
 |
 |
|
| Space of time: 26.02.-09.03.2007 |
| Size of excavation team: 1 |
| Size of excavation area: 10 m² |
 |
 |
|
| Space of time: 08.02.-01.03.2007 |
| Size of excavation team: 4 |
| Size of excavation area: 80 m² |
 |
 |
|
| Space of time: 18.09.2006 - 01.02.2007 |
| Size of excavation team: 4 - 12 |
| Size of excavation area: 1300 m² in bis zu 6 Plana, gesamte Untersuchungsfläche 2300 m² |
 |
 |
|
| Space of time: 15.11.-17.12.2006 |
| Size of excavation team: 1 |
| Size of excavation area: 3000 m² |
 |
 |
|
| Space of time: 26.09.-10.10. und 31.10.-14.11.2006 |
| Size of excavation team: 1-7 |
| Size of excavation area: Gesamtbeobachtungsfläche 140000 m² |
 |
 |
|
| Space of time: 27.10.-23.11.2006 |
| Size of excavation team: 4 |
| Size of excavation area: 450 m² |
 |
 |
|
| Space of time: 30.10.-10.11.2006 |
| Size of excavation team: 2 |
| Size of excavation area: 80 m² |
 |
 |
|
| Space of time: 26.06.-10.08. und 04.10.-27.10.2006 |
| Size of excavation team: 3 - 8 |
| Size of excavation area: 100 m² |
 |
 |
|
| Space of time: 26.09.-26.10.2006 |
| Size of excavation team: 3 |
| Size of excavation area: 7 m² |
 |
 |
|
| Space of time: 31.07.-28.08.2006 |
| Size of excavation team: 5-6 |
| Size of excavation area: 6185 m² |
 |
 |
|
| Space of time: 03.04.-22.08.2006 |
| Size of excavation team: bis zu 10 |
| Size of excavation area: 6820 m² |
 |
 |
|
| Space of time: 17.07.-21.08.2006 |
| Size of excavation team: 4 - 5 |
| Size of excavation area: 40 m² |
 |
 |
|
| Space of time: 18.04.-20.07.2006 |
| Size of excavation team: 7 |
| Size of excavation area: 4200 m² |
 |
 |
|
| Space of time: 01.12.2005 - 21.03.2006 und 04.-19.07.2006 |
| Size of excavation team: 3 - 8 |
| Size of excavation area: 250 m² in bis zu 10 Plana, gesamte Untersuchungsfläche 1250 m² |
 |
 |
|
| Space of time: 15.05.-29.06.2006 |
| Size of excavation team: 4 |
| Size of excavation area: 30 m² |
 |
 |
|
| Space of time: 20.04.-18.05.2006 |
| Size of excavation team: 4 |
| Size of excavation area: 480 m² |
 |
 |
|
| Space of time: 13.03.–21.04.2006 |
| Size of excavation team: 5-6 |
| Size of excavation area: 2740 m² |
 |
 |
|
| Space of time: 06.-13.04.2006 |
| Size of excavation team: 2 |
| Size of excavation area: 20 m² |
 |
 |
|
| Space of time: 29.8.2005 - 20.2.2006 |
| Size of excavation team: durchschnittlich 8 |
| Size of excavation area: ca. 2000 m² |
 |
|
|
| Space of time: 25.7.-15.12. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 81 m² |
 |
|
|
| Space of time: 10.–15.11. |
| Size of excavation team: durchschnittlich 5 |
| Size of excavation area: ca. 300 m² |
 |
|
|
| Space of time: 20.–27.10. |
| Size of excavation team: 2 |
| Size of excavation area: 70 m² |
 |
|
|
| Space of time: 17.5.–25.10. |
| Size of excavation team: durchschnittlich 8 |
| Size of excavation area: ca. 1150 m² |
 |
|
|
| Space of time: 4.8.–6.10. |
| Size of excavation team: 4 |
| Size of excavation area: ca. 460 m² |
 |
|
|
| Space of time: 19.9.–5.10. |
| Size of excavation team: 4-5 |
| Size of excavation area: ca. 45 m² |
 |
|
|
| Space of time: 5.4.–27.5. und 24.8.–10.9. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 17 m² |
 |
|
|
| Space of time: 6.7.–11.8. |
| Size of excavation team: 3 |
| Size of excavation area: ca 17400 m² |
 |
|
|
| Space of time: 13.–27.7. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 165 m² |
 |
|
|
| Space of time: 12.–18.7. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 26 m² |
 |
|
|
| Space of time: 4.7.–13.7. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 80 m² |
 |
|
|
| Space of time: 25.5.–27.6. |
| Size of excavation team: 6 |
| Size of excavation area: ca. 2600 m² |
 |
|
|
| Space of time: 22.2.–24.3. |
| Size of excavation team: 1-2 |
| Size of excavation area: ca. 14 m² |
 |
|
|
| Space of time: 21.–24.3. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 19 m² |
 |
|
|
| Space of time: 31.1.–15.2. |
| Size of excavation team: 3 |
| Size of excavation area: 35 m² |
Nuremberg |
 |
Deep urban archeology in "Hintere Ledergasse 41", watching brief on construction in a former Tanner's house. Several evidences of the craftmans work and details of the building's history of construction up to medieval times were uncovered. |
| Space of time: 6.8. - 30.11. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 65 m² |
Estenfeld-Kuernach, District Wuerzburg |
 |
Excavation in advance of transport connection WÜ 26 to the B19. In the first trench settlement remains of the Late Hallstatt/Early La Tène period were recorded. There some storage pits with plenty of finds and a coru killu have been disclosed. In the further course of this excavations a wide-stretching Linearbandceramic settlement with several pits and some house plans were unearthed. Beside that some pits dating to the mid-neolithic Grossgartach Culture have been examined. |
| Space of time: 13.4. - 26.4. und 7.6. - 26.10. |
| Size of excavation team: 7-10 |
| Size of excavation area: Fläche 1 ca. 800 m²; Fäche 2 ca. 8600 m² |
Obernburg a. Main, District Miltenberg |
 |
Excavation in advance of construction. Civil settlement with evidence of a Roman road as well as of the structure of the Vicus development with timber and stone buildings and a well. |
| Space of time: 26.4. - 21.10. |
| Size of excavation team: 12 |
| Size of excavation area: ca. 730 m² |
Segnitz, District Kitzingen |
|
Archeological evaluation at "Schindäcker". In the course of this evaluation an early medieval cemetery with some circular enclosures at the northern fringe of the village was recorded. |
| Space of time: 20.9. - 23.9. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 378 m² |
Geldersheim, District Schweinfurt |
|
Archeological watching brief in the periphery of St. Nikolaus Church This activity led to the recording of several burial layers, dating from the 12th/13th century AD to post medieval times, in some smaller trenches around the church building. |
| Space of time: 16.8. - 22.9. |
| Size of excavation team: 1-2 |
| Size of excavation area: ca. 17 m² |
Wuerzburg |
 |
Preconstruction deep urban archeology in the field of the former Domherrnhof "ad St. Gallum" Kardinal-Doepfner-Platz 1, early Middle Ages to Modern Times Principally wall structures were disclosed which date back to the early Middle Ages. Among them are also parts of the chapel St. Gallus from the 12th century, which can be reconstructed as a seemingly hexagonal central construction. |
| Space of time: 25.5. - 8.7. |
| Size of excavation team: 2-3 |
| Size of excavation area: 15 m² |
Wuerzburg |
 |
Deep urban excavation re-assessing last years archeological watching brief at Hofstrasse 13. Further informations on the earliest town fortification were secured. |
| Space of time: 24.5. -28.5. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 40 m² |
Nuremberg |
|
Deep urban machine monitoring at Hauptmarkt 1 "Fleischhaus". Evidence of previous late medieval activity has been recorded on the outside of the historic Fleischhaus-building. |
| Space of time: 14.5. und 17.5. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 2,5 m² |
Hammelburg-Diebach, District Bad Kissingen |
 |
Re-assessment to the excavation in 2003.
|
| Space of time: 20. - 28.4. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 26 m² |
Nuremberg |
 |
Pre-development excavation in the course of which late-medieval development structures with evidence of workmanship activities were excavated.
|
| Space of time: 19.2. - 28.4. |
| Size of excavation team: 7-8 |
| Size of excavation area: ca. 426 m² |
Beilngries, District Eichstaett |
 |
Evaluation in the scope of a planned golf course with Late Hallstatt-period settlement finds.
|
| Space of time: 5., 9. und 29.3. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 345 m² |
Obernbreit, District Kitzingen |
|
Archaeological watching brief in the ground floor of the town hall.
In this excavation late-medieval and modern times finds regarding the building's history of construction and use were examined. |
| Space of time: 25.2. - 25.3. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 82 m² |
Estenfeld-Kuernach, District Wuerzburg |
|
Preconstruction evaluation in the area of transport connection WÜ 26 to the B 19. In two completed partitions we were able to provide evidence for a small Late Hallstatt/Early La Tène period as well as a wide-stretching Linearbandceramic settlement location. |
| Space of time: 9. - 24.3. |
| Size of excavation team: 2-3 |
| Size of excavation area: ca. 3440 m² |
Wuerzburg |
 |
Archaeological excavation in the area of an open space in Tiepolo and Landwehrstraße.
Here parts of the late-medieval suburban fortification and its high medieval predecessor building in timber-earth-technique were recorded. |
| Space of time: 23.2. - 17.3. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 90 m² |
Beilngries, District Eichstaett |
 |
Predevelopment evaluation in a medieval suburban area with high medieval and modern times finds.
|
| Space of time: 9.2. - 1.3. |
| Size of excavation team: 4-5 |
| Size of excavation area: ca. 138 m² |
Huettenheim-Possenheim, District Kitzingen |
 |
Evaluation in the fringe area of a settlement of Late Hallstatt period.
|
| Space of time: 26.1. und 2.2. - 10.2. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 2650 m² |
Wuerzburg |
 |
Predevelopment deep urban excavation in the scope of Hofstraße 13. In the course of this assessment Wuerzburg's first urban fortification from the beginning high medieval times could be examined on the premises of the former "Katzenwicker Hof" as well as further structures - among them several pebble surfaces of a lane used in medieval and modern times and the waste pit of a late-medieval knucklebone carver workshop. |
| Space of time: 23.6. - 14.11. |
| Size of excavation team: 8 |
| Size of excavation area: ca. 510 m² |
Hallstadt, District Bamberg |
|
Evaluation in advance of construction in the scope of the citizen's house.
|
| Space of time: 15.9. - 28.10 |
| Size of excavation team: 4 |
| Size of excavation area: ca. 129 m² |
Rothenburg o.d. Tauber, District Ansbach |
|
Archeological watching brief in the scope of the Imperial Town Museum. In the scope of the priorate building of the former Dominican Monastery chiefly modern times construction structures could be examined. |
| Space of time: 22.9. - 28.10. |
| Size of excavation team: 2-3 |
| Size of excavation area: ca. 46 m² |
Wuerzburg |
 |
Archeological watching brief on redevelopment and new design of Kiliansplatz. In the course of this machine monitoring numerous medieval structurs - especially burials and stone building features - could be fixed, which supplement the results of excavations in the annexe of Kilianshaus in 2001. |
| Space of time: 14.4. - 12.9. |
| Size of excavation team: 5-9 |
| Size of excavation area: ca. 600 m² |
Hammelburg-Diebach, District Bad Kissingen |
|
Redevelopment watching brief in the periphery of St. Georg Church. In this watching breif prehistorical settlement features as well as high medieval graves and construction structures could be disclosed. |
| Space of time: 18.8. - 10.9. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 26 m² |
Unterpleichfeld, District Wuerzburg |
 |
Predevelopment excavation in the area of the planned industrial estate "Spielleite II". In three larger partial areas a complete single plan of a house of the older Linearbandceramic (ca. 5500 to 5400 BC) including surrounding economic sector could be excavated there, as well as far-stretching pit complexes of the middle Neolithic, several storage pits of the older Urnfield culture (ca. 1250 to 1000 BC) and a more than 8,5 m deep shaft with yet unclear function. |
| Space of time: 23.4. - 9.9. |
| Size of excavation team: 8 |
| Size of excavation area: ca. 7032 m² |
Niedernberg, District Aschaffenburg |
 |
Archaeological watching brief on the redevelopment of local drainage trenches. These excavations provided evidence for a seemingly timber predecessor building to the Roman stone fort. Beside that the course of the fortification wall of the encampment in a so far contentious field could be clarified. |
| Space of time: 14.7. - 20.8. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 75 m² |
Wuerzburg |
|
Archaeological examination trench in the scope of an open space in Tiepolo and Landwehrstraße. This preconstruction test pit led to evidence about the urban fortification of the Sanderau city extension around 1200 as well as settlement structures of the Hallstatt period (ca. 800 to 480/450 BC). |
| Space of time: 6.6. - 7.8. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 117 m² |
Elsenfeld, District Miltenberg |
 |
Archaeological evaluation and excavation in advance of construction in the area of the planned services and trade centre. Here in the fringe of a cemetery dating to the early Hallstatt period (ca. 800 to 550 BC), several cremations - among them a burial with unbroken urn - as well as a small cult annexe could be disclosed. |
| Space of time: 10.2. -14.2. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 1560 m² |
Mainsondheim, District Kitzingen |
|
Archaeological evaluation in the area of a planned noise protection wall at the A3. In the course of the evaluation settlement structures - pits and post-holes - of the Late Hallstatt and Early La Tène period (ca. 550 to 400 BC) were disclosed. |
| Space of time: 2. - 7.4. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 2050 m² |
Sennfeld, District Schweinfurt |
 |
Archaeological research excavation in the area of the new building of the Protestant Community Centre. In the courtyard of the community centre the remains of the Romanic church building with late-medieval burials in the choir and early modern times burial in the outer area were excavated in order to complete the results of last years excavation. |
| Space of time: 10.1. - 4.4. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 37 m² |
Zellingen, District Main-Spessart |
|
Archaeological evaluation and watching brief in the garden of a worn off palace. Here modern times structures about water supply and return were disclosed and recorded. |
| Space of time: 11. - 21.3. |
| Size of excavation team: 6 |
| Size of excavation area: ca. 482 m² |
Schweinfurt |
|
Archaeological excavation in the area of the public park "Weißer Turm". In a trench a section of Schweinfurt's medieval and modern times urban fortification could be proved and recorded. |
| Space of time: 2. und 9.9., 23.9. - 22.10.2002 und 18.2. - 7.3.2003 |
| Size of excavation team: 5 |
| Size of excavation area: ca. 108 m² |
Muennerstadt, District Bad Kissingen |
 |
Archaeological evaluation and preconstruction excavation in Juliusspital, for the extension of the old people's home. It brought about new insight into colonisation and development of the medieval town and into the economic buildings of the former cloister. |
| Space of time: 29.10. - 23.12. |
| Size of excavation team: 11 |
| Size of excavation area: ca. 295 m² |
Schweinfurt |
|
Archaeological evaluation in the area of a planned quarter garage. Settlement legacies of the late Middle Ages to today were disclosed. Added to this were probably high medieval and prehistorical remains. |
| Space of time: 2.9. - 8.11. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 75 m² |
Kaltensondheim, District Kitzingen |
|
Predevelopment test pit in the periphery of a burial mound cemetry from the Hallstat period. Only some prehistoric finds without any structures could be fixed. |
| Space of time: 28.10. - 30.10. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 550 m² |
Sennfeld, District Schweinfurt |
|
Archaeological evaluation and preconstruction excavation in the area of the planned new building of the Protestant Community Centre. Early medieval settlement traces and the remains of the medieval development along the church were documented. In addition medieval and modern times graves were disclosed. |
| Space of time: 6.8. - 20.9. |
| Size of excavation team: 6 |
| Size of excavation area: ca. 440 m² |
Eßfeld, District Wuerzburg |
 |
Continuation of the archaeological excavation in the new building area. Here remains of a Hallstatt period (ca. 800 to 480/450 BC) settlement were unearthed, as well as graves of the Merowingian period (7. Cent. AC). |
| Space of time: 22.7. - 7.8. |
| Size of excavation team: 4 |
| Size of excavation area: ca. 298 m² |
Aschaffenburg |
|
Archaeological evaluation at Martinushaus. Here remains of the bishop pension office were disclosed as well as settlement structures of the 11th (?)/12th century suburb. |
| Space of time: 9.7. - 7.8. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 47 m² |
Wuerzburg |
|
Archaeological evaluation in Heinestraße 8 and 10. It provided information about the suburban development in the 13th century. |
| Space of time: 25.7. - 26.7. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 11,5 m² |
Lintach, District Amberg-Sulzbach |
 |
Archaeological excavation in the cemetery. The modern times and medieval cemetery was recorded. Here also Slawic graves of the 8th to 11th century were unearthed. |
| Space of time: 2.5. - 22.7. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 375 m² |
Kitzingen |
 |
Archaeological excavation in Taenningstraße. Here parts of a settlement of the Urnfield and Hallstatt period as well as the Early La Tène period (9th to 5th century BC) were excavated. |
| Space of time: 21.5. - 5.7. |
| Size of excavation team: 6 |
| Size of excavation area: ca. 350 m² |
Hoesbach, District Aschaffenburg |
|
Preconstruction watching brief at St. Michael church. Within this the baroque predecessor building of the church was excavated. Beside that an older cemetery could be recorded. |
| Space of time: 19.6. - 4.7. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 640 m² |
Strullendorf, District Bamberg |
 |
Predevelopment excavation for the planned new building of the school gymnasium. Settlement legacies of the Michelsberg Culture (around 4000 BC) and the Urnfield and Hallstatt period (10th to 6th century BC) were examined. In addition traces of modern times agriculture were recorded. |
| Space of time: 17. - 25.4. |
| Size of excavation team: 8 |
| Size of excavation area: ca. 625 m² |
Obernburg a. Main, District Miltenberg |
 |
Archaeological excavation in Schillerstraße 3. It revealed new details about the structure of the Roman Vicus. Besides troves and features from the periphery of a Roman bakery (e.g. a corn kiln) also finds of the early Middle Ages were unearthed. |
| Space of time: 4.3. - 19.4. |
| Size of excavation team: 6 |
| Size of excavation area: ca. 286 m² |
Veitshoechheim, District Wuerzburg |
|
Continuation of the archaeological excavation on palace terrace in the rococo garden. Here parts of the modern times palace garden were examined. |
| Space of time: 27.8.2001 - 22.3.2002 |
| Size of excavation team: 2 |
| Size of excavation area: ca. 120 m² |
Moenchsondheim, District Kitzingen |
|
Watching brief in the Curch Castle Museum in Moenchsondheim. A cellar from the times between 14th and 18th century was examined. |
| Space of time: 11.3. - 13.3. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 1 m² |
Wuerzburg |
 |
Archaeological excavation in Leistenstraße. A settlement section of the Early La Tène peroid (5th century BC) with several storage pits was recorded. |
| Space of time: 2.11. - 13.12. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 568 m² |
Veitshoechheim, District Wuerzburg |
|
Archaeological excavation on palace terrace in the rococo garden. Parts of the modern times palace garden were examined here. |
| Space of time: 27.8.2001 - 22.3.2002 |
| Size of excavation team: 2 |
| Size of excavation area: ca. 120 m² |
Wuerzburg |
 |
Predevelopment deep urban excavation at Kilianshaus.
It revealed a very dense record of news about the town history from the early Middle Ages to Modern Times. Especially details of the Neumuenster Church building history of yet unknown church buildings with a sarcophagus burial and of several layers of the local cemetery dating from the mid 6th to the mid 12th Cent. AD. were recorded. |
| Space of time: 8.1. -18.10. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 131 m² |
Wuerzburg |
 |
Archeological watching brief in the area of "Heinestrasse 11a". This examination could fix the course of a part of the late medieval city wall with a small gate, called "Kritzelpforte". Further more parts of the 18th century circular drainage trench and a bathing house, which was used until WWII, were unearthed. |
| Space of time: 5. - 10.9. und 24. - 29.9. |
| Size of excavation team: 2-3 |
| Size of excavation area: ca. 158 m² |
Wuerzburg |
|
Archeological watching brief at Katzengasse 10. Here a large number of traces of postmedieval building activity was recorded. |
| Space of time: 5., 6. und 10.9. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 100 m² |
Moemlingen, District Miltenberg |
|
Predevelopment evaluation in the fringe of the village centre. In the area of a pulled down restaurant several different bulding and settlement structures were disclosed and mainly late medieval finds could be recorded. |
| Space of time: 3. - 4.9. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 80 m² |
Niedernberg, District Miltenberg |
|
Archeological watching brief regarding canalisation operations. In the area of the Roman fort remains of the Principia (staff building) were examined. |
| Space of time: 12.3. - 31.5. |
| Size of excavation team: 4 |
| Size of excavation area: ca. 83 m² |
Hallstadt, District Bamberg |
|
Further watching brief at the old town hall. Archaeological layers of the expiring Bronze Age to the 20th century were examined. In addition a presumably Carolingian cemetery was cross sectioned. |
| Space of time: 12.2. - 12.4. |
| Size of excavation team: 3-4 |
| Size of excavation area: ca. 80 m² |
Hallstadt, District Bamberg |
|
Archaeological evaluation in the industrial estates Hallstadt West II and III. Here settlement remains of the high Middle Ages and Modern Times were registered. |
| Space of time: 18.12.2000 - 4.1.2001 |
| Size of excavation team: 3 |
| Size of excavation area: ca. 1730 m² |
Bamberg |
 |
Archaeological evaluation in the Burgershof of the University of Bamberg. Here parts of the medieval fortification ditch were cross sectioned. Time setting stretched from 11th to 18th century. |
| Space of time: 4.10. - 12.12. |
| Size of excavation team: 6 |
| Size of excavation area: ca. 140 m² |
Stockstadt a. Main, District Miltenberg |
|
Archaeological evaluation in the area of the Roman cemetery.
|
| Space of time: 29.9. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 18 m² |
Haßfurt |
 |
Archaeological evaluation on the premises of Brewery Hiernickel. It was directed towards the remains of the medieval urban fortification. |
| Space of time: 25.9. - 29.9. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 26 m² |
Hallstadt, District Bamberg |
 |
Archeological watching brief at the old town hall. Archaeological layers from the expiring Bronze Age to the 20th century were recorded. In addition a presumably Carolingian cemetery was cross sectioned. |
| Space of time: 26.6. - 27.7. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 80 m² |
Eßfeld, District Wuerzburg |
|
Preconstruction excavation in new building area. Here settlement remains and post-holes of the Hallstatt period (8th to 6th century) were unearthed. |
| Space of time: 3.7. - 24.7. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 360 m² |
Schnaittach, District Nuernberger Land |
|
Archeological watching brief in the bathing house. Sweat ovens were examined and cross sections recorded which contained layers from 13th/14th up to 19th century. |
| Space of time: 12.3. - 17.4. |
| Size of excavation team: 3 |
| Size of excavation area: ca. 150 m² |
Moenchsondheim, District Kitzingen |
|
Archeological watching brief in the area of the Church Castle Museum in Moenchsondheim. Linearbandceramic settlement pits (6th millenium BC) were cross sectioned and a Modern Times ditch with bridge was recorded. |
| Space of time: 4.2. - 10.3. |
| Size of excavation team: 1 |
| Size of excavation area: ca. 62,5 m² |
Wuerzburg |
|
Archaeological excavation in Pleicherkirchgasse. Here parts of the suburban development of the early and high Middle Ages were examined. In addition to single finds from prehistorical times successive layers starting from 7th/8th century were recorded. |
| Space of time: 2.8.1999 - 27.2.2000 |
| Size of excavation team: 10 |
| Size of excavation area: ca. 650 m² |
Wuerzburg |
 |
Preconstruction deep urban excavation in Domerschulstraße 16, in co-operation with ReVe, Bamberg. Here parts of the town fortification of the early and high Middle Ages and medieval building structures were examined. The successive layers stretched from 5th to 20th century, single finds date back to the Mesolithic (ca. 8th millenium BC). |
| Space of time: 18.1. - 8.7. |
| Size of excavation team: 12 |
| Size of excavation area: ca. 1340 m² |
Oberhaid, District Bamberg |
|
Archaeological evaluation and preconstruction excavation in the industrial estate Unterhaid-West A.
A high-medieval road was recorded. In addition finds and features of the Urnfield period (12th to 8th century BC) were disclosed. |
| Space of time: 24.4. - 28.6. |
| Size of excavation team: 3-4 |
| Size of excavation area: ca. 842 m² |
Hilpoltstein, District Roth |
|
Deep urban excavation. Here a presumably Romanesque house was recorded, the periods of activity stretched from 12th to 20th century. |
| Space of time: 8.2. -10.3. und 22.4. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 26 m² |
Wuerzburg |
|
Archaeological evaluation in Domerschulstraße 16. Building structures from 8th to 20th century were registered. |
| Space of time: 21.10. - 1.12. |
| Size of excavation team: 5 |
| Size of excavation area: ca. 163 m² |
Coburg |
|
Deep urban archeological watching brief. Here the monastery development in the area of a Renaissance palace was examined. Time setting covered besides the early Middle Ages the 13th to 19th century. |
| Space of time: 21.9. - 6.10 |
| Size of excavation team: 3 |
| Size of excavation area: ca. 200 m² |
Niedernberg, District Miltenberg |
|
Archaeological excavation in the Roman fort and Vicus area. Parts of the fort gate and the settlement from 1st to 4th century AD were recorded. |
| Space of time: 2.3. - 30.4. |
| Size of excavation team: 4 |
| Size of excavation area: ca. 117 m² |
Oberhaid, District Bamberg |
 |
Archaeological evaluation in industrial estate Unterhaid West A. It was directed at recording of a high medieval road. In addition Urnfield period (12th to 8th century BC) legacies were unearthed. |
| Space of time: April |
| Size of excavation team: 4 |
| Size of excavation area: ca. 200 m² |
Schweinfurt |
|
Deep urban watching brief in Burggasse 17. Layer succession in the front end of the presumable Markgrafenburg since 12th(?)/13th century was examined. |
| Space of time: 9.3. - 10.4. |
| Size of excavation team: 4 |
| Size of excavation area: ca. 46 m² |
Haßfurt |
|
Predevelopment excavation "Am Tränkberg 12". The high medieval town ditch and an early-medieval ditch in the front end of the master's court were recorded. Time setting covered the 3rd(?)/4th to 15th century. |
| Space of time: 20.10. - 4.11. |
| Size of excavation team: 4-5 |
| Size of excavation area: ca. 360 m² |
Haßfurt |
|
Archaeological testpit and predevelopment excavation at "Alte Mainmühle". Assessment was directed at a 16th century mill. |
| Space of time: 8.9. - 8.10. |
| Size of excavation team: 2 |
| Size of excavation area: ca. 36 m² |
 
|